USMS Holding Cell Plumbing Repairs
Roszkowski U.S. Courthouse
Project Details
Agency
General Services Administration
Project Delivery
Bid Build
Project Type
Courthouse
Year (of award)
2022
Location
Rockford, IL
Project Description
Work consisted of the rerouting and repair of an existing flush-out plumbing supply line. A leak detection system was installed with all required electrical hookups, and this was tied into the building’s BAS system. This line was directly above the building’s IT Room, so extreme planning and caution were considered. Work in the IT Room (above IT Equipment) was thoroughly coordinated with building management and the IT manager. Existing equipment remained in service and was protected from all construction operations. All equipment located under the water lines or drain lines was secured and protected with thick plastic. The bottom had to be left open so the equipment could breathe and not overheat.